20110918

Re-designing the bathroom_Iteration 2

 Beginning to create the progressive bathroom based on the Bathroom Diary and duration spent within the bathroom. Shows how design would have to penetrate existing structure.

 Plan view of new intervention - progression from sink to shower to bath - only diagrammatic at present.
Perspective view of proposed design in diagram form.


Ideas I have had which will follow on from this:
Duration dictates size of sink, bath, shower etc. Bath smallest, sink largest.
Create a ribbon.
WQould like it to be a progression - walk through the sink to the shower and further to the bath etc.